Grosvenor Waterside, London – Façade Design – Fire remediation project
Since 2021, Patrick Ryan Associates have been pleased to be involved in RIBA stages 3 to 5 for the recladding...
Since 2021, Patrick Ryan Associates have been pleased to be involved in RIBA stages 3 to 5 for the recladding...
Façade fire safety surveys for removal and replacement of flammable cladding.